Testing Our 10kW Mobile Wind Turbine

MPS-cover-slide.jpg

After successful testing at our San Diego facility, we towed the Mobile Power Station to Fiesta Island in Mission Bay for offsite field testing.

The portable wind turbine was towed on local roadways and after arriving at the test site was fully setup in under an hour.

On the day of the test, we experienced wind speeds between 4.5-5.8m/s (10-13mph). These wind speeds produced up to 5kW of output and the Dancing with the Wind electronics precisely managed rotor RPM to an optimized tip-speed-ratio.